null Manfredonia - Porto Industriale

Manfredonia - Porto Industriale

boat

8

Berths available

boat

9.5

Maximum mooring length

boat

10

Maximum mooring depth

  • Fuel stations
  • Commercial services
  • Number of extra-hotel accommodation beds: 108
  • Number of parking spaces: 144
  • Maximum mooring length: 9.5
  • Maximum mooring depth: 10
  • Berths available: 0
  • Description of the tools and resources for the automatic detection of berths: Port Community System GAIA
  • Connection with local public transport
  • Connection with suburban public transport
  • Connection with national and regional cycle route plan
  • Connection with the railway transport service
  • Connection with the air transport service
  • Connection with public utility services

Maintenance projects in place

  • Description: Primi interventi dimessa in sicurezza strutturale, lavori dimanutenzione e tenuta in esercizio degli impianti negliambiti demaniali, lavori dimanutenzione e tenuta in esercizio delle infrastrutture civilinegli ambiti demaniali,Interventi a sostegno della pesca

Need for maintenance

Provision of services inside the port

There are no such services